Full exterior repaint and trim restoration in Burlington
A full-scope repaint to fix failing cladding, rotten trim and provide long-term protection for a two-storey home in Burlington.

- 1
1. Full inspection and targeted demo
We started with a hands-on inspection of all elevations, opening suspect joints and testing moisture levels in the fibre-cement with a pin-type meter. Rotted cedar trim, split corner boards and failed back-primed patches were removed and replaced with primed, clear-grade cedar where required.
- 2
2. Prep: cleaning, sanding and priming
Surfaces were soft-washed to remove mildew and salt deposits using a low-pressure sodium hypochlorite mix to avoid driving water into joints. All chalky and loose coatings were abraded with 80–120 grit sanding; bare fibre-cement and new wood received a high-performance acrylic latex bonding primer (ASTM-compliant, exterior grade) to promote adhesion.
- 3
3. Flashing, joint and caulking upgrades
We replaced damaged flashing at window heads and sills and sealed control joints with a low-modulus, paintable silicone-urethane hybrid sealant rated for exterior use. Proper joint detail and breathable backer rod placement prevent water intrusion—critical in Halton Region’s freeze-thaw conditions.
- 4
4. High-build topcoats for durability
For the topcoat we applied two coats of premium 100% acrylic, high-build exterior paint with UV stabilizers and anti-microbial additives to resist mildew. Trim received an oil-modified alkyd primer on raw wood followed by an acrylic-polyurethane enamel topcoat for abrasion resistance on high-touch surfaces.
- 5
5. Final inspection, touch-ups and documentation
We performed a walk-around with the homeowner to mark touch-ups, checked caulk bonds and paint film thickness in critical areas, then compiled a maintenance and warranty package outlining product data sheets, recoat intervals and recommended cleaning methods for Burlington’s climate.
Frequently Asked Questions
How long will a full exterior repaint like this take?
Typical time for a two-storey home with trim restoration is one to two weeks of active on-site work, not counting weather delays. In Burlington, we build extra buffer time in spring and fall for temperature or rain interruptions.
How disruptive is the work—will we need to move out?
Most homeowners stay in place. We use staged scaffolding and keep access paths clear, and we organise noisy prep work during daytime hours. Because we’re email-only for project communication, all scheduling and notes are documented so residents always know the plan.
How do I know if my house needs full repaint versus spot repairs?
Look for widespread adhesion loss, recurring mildew, soft or rotted trim and coats that fail in multiple exposures. A focused inspection—moisture testing and pulling back suspect paint—lets us decide between targeted repairs and a full system overhaul so you’re not paying for unnecessary work.
Ready to stop repaint cycles and get it done right in Burlington?
Email us the property details and photos—service across Burlington, Halton Region and nearby Oakville and Hamilton.
Get a Free Quote